BIM Standards Library

VN ↔ ISO cross-reference index · Document summaries · Validity status · Links to official sources

DecreeNĐ 217/2026/NĐ-CPIn Force2026

Detailing certain articles of the Construction Law on construction activity management

The sole binding BIM decree (Art. 8): BIM mandatory for new-build Grade II+ regardless of funding; BIM data submitted in the open IFC standard or another open format suited to the project, with the native format provided on request for cross-checking (§3); CDE mandatory Grade I+ public-investment (§4); as-built model to national DB and BIM data handed over to the operator (§5d).

See also:Luật Xây dựng 135/2025/QH15NĐ 85/2025/NĐ-CPTT 34/2026/TT-BXDISO 19650-2:2018
LawLuật Xây dựng 135/2025/QH15In Force2025

Construction Law 2025 (effective 01/07/2026)

Governing Construction Law. Article 7(3)(b) provides for applying IT, digital transformation and building information modelling (BIM) in construction activities. The BIM obligation is detailed in Decree 217/2026, Article 8.

See also:NĐ 217/2026/NĐ-CP
DecreeNĐ 85/2025/NĐ-CPIn Force2025

Detailing the Public Investment Law on management and use of public investment capital

Project classification into Group A/B/C (Art. 13 + Annex I). Basis for identifying 'public investment projects' subject to mandatory CDE under Decree 217 Art. 8 §4.

See also:NĐ 217/2026/NĐ-CPLuật Xây dựng 135/2025/QH15
GuidelineTT 34/2026/TT-BXDIn Force2026

Detailed regulation on construction work grades for construction management (effective 01/07/2026)

Criteria for construction grade (special, I, II, III, IV) — basis for the Grade II+ BIM threshold in Decree 217. Replaces Circular 06/2021/TT-BXD (expired 01/07/2026). Art. 5 transition: projects with an investment decision before the effective date keep the grade under the law at the time of that decision.

See also:NĐ 217/2026/NĐ-CPQCVN 03:2022/BXD
GuidelineQCVN 03:2022/BXDIn Force2022

National technical regulation on construction work grade classification and application guidance

Technical regulation for consequence class (C1/C2/C3) and construction grade in design phase. Used alongside Circular 34/2026 to determine BIM mandatory scope.

See also:TT 34/2026/TT-BXDNĐ 217/2026/NĐ-CP
TCVNTCVN 14177-1:2024In Force2024

Organization and digitization of information — Part 1: Concepts and principles

Vietnamese standard prepared on the basis of ISO 19650-1:2018. Establishes PIM, AIM, CDE, appointing/appointed party concepts and BIM information management principles for Vietnam.

See also:TCVN 14177-2:2024ISO 19650-1:2018NĐ 217/2026/NĐ-CP
TCVNTCVN 14177-2:2024In Force2024

Organization and digitization — Part 2: Delivery phase of the assets

Vietnamese standard prepared on the basis of ISO 19650-2:2018. Specifies EIR→pre-BEP→BEP→PIM flow, lead appointed party role, CDE process. Primary EIR/BEP reference for VN projects.

See also:TCVN 14177-1:2024ISO 19650-2:2018NĐ 217/2026/NĐ-CP
ISOISO 19650-1:2018In Force2018

Organization and digitization of information about buildings — Part 1: Concepts and principles

Establishes core concepts (PIM, AIM, CDE, Appointing/Appointed Party) and BIM principles per ISO. Foundation for the entire ISO 19650 series. Vietnamese counterpart: TCVN 14177-1:2024 (prepared on the basis of ISO 19650-1).

See also:TCVN 14177-1:2024ISO 19650-2:2018ISO 7817-1:2024
ISOISO 19650-2:2018In Force2018

Organization and digitization — Part 2: Delivery phase of the assets

Specifies information delivery in design & construction: EIR → Tender (pre-BEP) → Delivery (BEP/PIM). Primary VN BIM practice reference. Vietnamese counterpart: TCVN 14177-2:2024 (prepared on the basis of ISO 19650-2).

See also:TCVN 14177-2:2024ISO 19650-1:2018NĐ 217/2026/NĐ-CP
ISOISO 19650-3:2020In Force2020

Organization and digitization — Part 3: Operational phase of the assets

Extends ISO 19650-2 to the operational phase. Guides AIM (Asset Information Model) maintenance post-handover. Relevant to national DB update obligation (Decree 217 §5d).

See also:ISO 19650-1:2018ISO 19650-2:2018NĐ 217/2026/NĐ-CP
ISOISO 19650-5:2020In Force2020

Organization and digitization — Part 5: Security-minded approach to information management

Guides security management of BIM information on the CDE. Sensitivity classification, access control, risk analysis. Referenced in EIR/BEP security sections.

See also:ISO 19650-2:2018NĐ 217/2026/NĐ-CP
ISOISO 7817-1:2024In Force2024

Level of Information Need (LOIN) — Part 1: Concepts and principles

ISO standard defining the method for determining Level of Information Need (LOIN). 3 components: Geometric, Alphanumeric (non-geometric), Documentation. Supersedes/withdraws EN 17412-1:2020 — it does not claim to replace LOD (BIMForum), which remains in use where projects choose to apply it.

See also:ISO 19650-1:2018ISO 19650-2:2018