BIM Standards Library
VN ↔ ISO cross-reference index · Document summaries · Validity status · Links to official sources
Detailing certain articles of the Construction Law on construction activity management
The sole binding BIM decree (Art. 8): BIM mandatory for new-build Grade II+ regardless of funding; BIM data submitted in the open IFC standard or another open format suited to the project, with the native format provided on request for cross-checking (§3); CDE mandatory Grade I+ public-investment (§4); as-built model to national DB and BIM data handed over to the operator (§5d).
Construction Law 2025 (effective 01/07/2026)
Governing Construction Law. Article 7(3)(b) provides for applying IT, digital transformation and building information modelling (BIM) in construction activities. The BIM obligation is detailed in Decree 217/2026, Article 8.
Detailing the Public Investment Law on management and use of public investment capital
Project classification into Group A/B/C (Art. 13 + Annex I). Basis for identifying 'public investment projects' subject to mandatory CDE under Decree 217 Art. 8 §4.
Detailed regulation on construction work grades for construction management (effective 01/07/2026)
Criteria for construction grade (special, I, II, III, IV) — basis for the Grade II+ BIM threshold in Decree 217. Replaces Circular 06/2021/TT-BXD (expired 01/07/2026). Art. 5 transition: projects with an investment decision before the effective date keep the grade under the law at the time of that decision.
National technical regulation on construction work grade classification and application guidance
Technical regulation for consequence class (C1/C2/C3) and construction grade in design phase. Used alongside Circular 34/2026 to determine BIM mandatory scope.
Organization and digitization of information — Part 1: Concepts and principles
Vietnamese standard prepared on the basis of ISO 19650-1:2018. Establishes PIM, AIM, CDE, appointing/appointed party concepts and BIM information management principles for Vietnam.
Organization and digitization — Part 2: Delivery phase of the assets
Vietnamese standard prepared on the basis of ISO 19650-2:2018. Specifies EIR→pre-BEP→BEP→PIM flow, lead appointed party role, CDE process. Primary EIR/BEP reference for VN projects.
Organization and digitization of information about buildings — Part 1: Concepts and principles
Establishes core concepts (PIM, AIM, CDE, Appointing/Appointed Party) and BIM principles per ISO. Foundation for the entire ISO 19650 series. Vietnamese counterpart: TCVN 14177-1:2024 (prepared on the basis of ISO 19650-1).
Organization and digitization — Part 2: Delivery phase of the assets
Specifies information delivery in design & construction: EIR → Tender (pre-BEP) → Delivery (BEP/PIM). Primary VN BIM practice reference. Vietnamese counterpart: TCVN 14177-2:2024 (prepared on the basis of ISO 19650-2).
Organization and digitization — Part 3: Operational phase of the assets
Extends ISO 19650-2 to the operational phase. Guides AIM (Asset Information Model) maintenance post-handover. Relevant to national DB update obligation (Decree 217 §5d).
Organization and digitization — Part 5: Security-minded approach to information management
Guides security management of BIM information on the CDE. Sensitivity classification, access control, risk analysis. Referenced in EIR/BEP security sections.
Level of Information Need (LOIN) — Part 1: Concepts and principles
ISO standard defining the method for determining Level of Information Need (LOIN). 3 components: Geometric, Alphanumeric (non-geometric), Documentation. Supersedes/withdraws EN 17412-1:2020 — it does not claim to replace LOD (BIMForum), which remains in use where projects choose to apply it.
Copyright notice: BIMKit only provides summaries and links to official sources. ISO/TCVN standards are copyrighted — full text is not hosted. Government documents (Decisions, Laws) are public domain.
